Kettering General

Hospital

RF Blount & Sons Ltd were contracted by the NHS Foundation Trust with the delicate job of removing the existing roof mounted chiller unit serving the A&E department and Fracture clinic at Kettering General Hospital

 

 The team assigned to this project replaced it with a new more efficient Ciat chiller unit. As the ground was not level at the new location a concrete base had to be installed to ensure the necessary support was in place for the new chiller unit which is located in a small courtyard deep within the hospital

 

The chiller was craned into position by the team and piped to the existing services. A new power supply was installed from the nearest consumer unit and BMS controls were fitted and integrated into the existing system

 

Roof mounted chiller
Crane placing roof mounted chiller at Kettering General Hospital